Jeffrey S. Russell, Ph.D., P.E., Dist.M.ASCE, NAC, F.NSPE
Formal Courses Taught
CEE 395 Materials of Constructed Facilities (co-taught with Professor Steven Cramer, CEE; student evaluations did not include Professor Russell) |
CEE 498 Construction Project Management (videotaped 1997) |
CEE 578 Senior Level Capstone Design |
CEE 596 Constructability Analysis (videotaped 1999) |
CEE 597 Construction Operation Analysis |
CEE 598 Construction Contractor Analysis |
CEE 649a Analysis of Construction Contractors |
CEE 649b Construction Technology and Automation |
CEE 698a Analysis of Construction Contractors |
CEE 698b Constructability Design & Analysis |
CEE 698c Construction Equipment and Heavy Construction Methods (co-taught with Professor Dick Struab, Ag Engrg) |
CEE 698d Construction Operation Analysis |
CEE 698e Constructed Facilities Graduate Seminar (co-taught with Professor Steven Cramer) |
CEE 698f Study of College of Engineering – 3rd Semester 1-credit course using Engineering Centers Building as a learning laboratory |
CEE 949 Construction Engineering and Management Research Seminar |
EPD 612 Technical Project Management |
EPD 690a Core Competencies of Leadership |
EPD 690b Core Competencies of Sustainability |
INTEREGR 400 Dean’s Leadership Class |
Courses denoted as CEE 649 a and b were different special topic courses within Structural Engineering. In 1991, we received approval for special topic courses in Construction Engineering and Management (i.e., CEE 698). The courses designed CEE 698 a, b, c, d, e, and f, again, were different special topic courses offered prior to developing formal course proposals. Courses EPD 690a and b were different special topics courses offered by Engineering Professional Development.
Student Evaluations
College of Engineering course and instructor evaluation (COE) forms were used by Dr. Russell as summarized below. Column A represents the mean overall student response for 21 questions rating the instructor on a scale of 1 to 4, where 4 is the highest. The maximum value in Column B gives the rating of the instructor relative to others the students have encountered (Questions #22). Here, the scale is 1 to 5, with 5 being the top 20th percentile.
Course |
Sem |
Enrollment |
Hours/Week |
Prof. Russell Mean A |
Quest #22B |
CEE 649a |
II/89 |
4 |
3 hrs. lecture |
3.46 |
4.5 |
CEE 649b |
I/90 |
3 |
3 hrs. lecture |
3.5 |
4 |
CEE 949 |
I/90 |
4 |
1 hr. lecture |
3.4 |
4.8 |
CEE 498 |
II/90 |
29 |
3 hrs. lecture |
3.71 |
4.93 |
CEE 698a |
I/91 |
14 |
3 hrs. lecture |
3.71 |
4.85 |
CEE 498 |
II/91 |
27 |
3 hrs. Lecture |
3.49 |
4.76 |
CEE 698b |
II/91 |
19 |
1 hr. lecture |
3.46 |
4.41 |
CEE 598 |
I/92 |
25 |
3 hrs. lecture |
3.59 |
4.68 |
CEE 698c |
I/92 |
7 |
3 hrs. lecture |
3.33 |
4.5 |
CEE 498 |
II/92 |
21 |
3 hrs. lecture |
3.47 |
4.7 |
CEE 698b |
II/92 |
4 |
3 hrs. lecture |
3.44 |
5 |
CEE 598 |
I/93 |
28 |
3 hrs. lecture |
3.62 |
4.67 |
CEE 698c |
I/93 |
4 |
1 hr. lecture |
3.48 |
5 |
CEE 698d |
I/93 |
8 |
2 hrs. lecture |
3.37 |
4.75 |
CEE 498 |
II/93 |
50 |
3 hrs. lecture |
3.51 |
4.87 |
CEE 596 |
II/93 |
14 |
2 hrs. lecture |
3.67 |
4.93 |
CEE 395 |
I/94 |
111 |
0.17 hr. lecture |
n/a |
n/a |
CEE 597 |
I/94 |
15 |
2 hrs. lecture |
3.33 |
4.27 |
CEE 598 |
I/94 |
32 |
3 hrs. lecture |
3.4 |
4.62 |
CEE 395 |
II/94 |
101 |
0.17 hr. lecture |
n/a |
n/a |
CEE 597 |
II/94 |
18 |
2 hrs. lecture |
3.33 |
4.27 |
CEE 598 |
II/94 |
32 |
3 hrs. lecture |
3.4 |
4.62 |
CEE 698c |
II/94 |
10 |
3 hrs. lecture |
2.84 |
2.7 |
CEE 498 |
I/95 |
33 |
3 hrs. lecture |
3.41 |
4.67 |
CEE 596 |
I/95 |
20 |
2 hrs. lecture |
3.57 |
4.74 |
CEE 598 |
II/95 |
29 |
3 hrs. lecture |
3.33 |
4.43 |
CEE 498 |
I/96 |
35 |
3 hrs. lecture |
3.47 |
4.59 |
CEE 596 |
I/96 |
17 |
3 hrs. lecture |
3.47 |
4.67 |
CEE 498 |
II/96 |
36 |
3 hrs. lecture |
3.35 |
4.63 |
CEE 596 |
I/98 |
16 |
3 hrs. lecture |
3.47 |
4.67 |
CEE 498 |
I/98 |
40 |
3 hrs. lecture |
3.04 |
3.96 |
CEE 698e |
I/98 |
26 |
1 hr. seminar |
n/a |
n/a |
CEE 596 |
I/98 |
16 |
3 hrs. lecture |
3.36 |
4.25 |
CEE 498 |
I/99 |
57 |
3 hrs. lecture |
3.4 |
4.58 |
CEE 596 |
I/99 |
16 |
3 hrs. lecture |
3.29 |
4.5 |
CEE 698e |
I/99 |
30 |
1 hr. seminar |
n/a |
n/a |
CEE 698f |
II/99 |
39 |
3 hrs. lecture |
n/a |
n/a |
CEE 498 |
I/00 |
37 |
3 hrs. lecture |
3.45 |
4.77 |
CEE 698f |
I/00 |
26 |
2.5 hrs. lecture |
3.64 |
4.83 |
CEE 698f |
I/00 |
30 |
2.5 hrs. lecture |
3.47 |
4.52 |
CEE 498 |
II/00 |
25 |
3 hrs. lecture |
3.21 |
4.5 |
CEE 596 |
II/00 |
9 |
3 hrs. lecture |
3.57 |
4.6 |
CEE 698 |
II/00 |
25 |
2.5 hrs. lecture |
3.6 |
4.77 |
CEE 498 |
I/01 |
22 |
3 hrs. lecture |
3.33 |
4.36 |
CEE 578 |
I/01 |
31 |
2.1 hrs. lecture |
3.41 |
4.61 |
CEE 498 |
II/00 |
25 |
3 hrs. lecture |
3.21 |
4.5 |
CEE 596 |
II/00 |
9 |
3 hrs. lecture |
3.57 |
4.6 |
CEE 698 |
II/00 |
25 |
2.5 hrs. lecture |
3.6 |
4.77 |
CEE 498 |
I/02 |
22 |
3 hrs. lecture |
3.33 |
4.36 |
CEE 596 |
II/02 |
9 |
3 hrs. lecture |
3.57 |
4.7 |
CEE 698 |
II/03 |
37 |
1 hr. lecture |
3.6 |
4.77 |
CEE 498 |
I/03 |
15 |
3 hrs. lecture |
3.33 |
4.55 |
CEE 578 |
I/03 |
31 |
2.1 hrs. lecture |
3.45 |
4.67 |
CEE 498 |
I/04 |
22 |
3 hrs. lecture |
3.44 |
4.83 |
CEE 578 |
I/04 |
41 |
2.1 hrs. lecture |
3.58 |
4.69 |
CEE 596 |
II/04 |
27 |
3 hrs. lecture |
3.15 |
4.05 |
CEE 698 |
II/04 |
31 |
2.5 hrs. lecture |
3.52 |
4.2 |
CEE 578 |
I/05 |
41 |
2.1 hrs. lecture |
3.51 |
4.6 |
CEE 578 |
I/06 |
56 |
2.1 hrs. lecture |
4.07 |
4.52 |
CEE 578 |
I/07 |
47 |
2.1 hrs. lecture |
4.02 |
4.49 |
EPD 612 |
I/07 |
19 |
3 hrs. lecture |
4.47 |
4.4 |
CEE 578 |
I/08 |
44 |
2.1 hrs. lecture |
3.89 |
4.57 |
EPD 612 |
I/08 |
28 |
3 hrs. lecture |
4.49 |
4.6 |
CEE 578 |
I/09 |
48 |
2.1 hrs. lecture |
3.91 |
4.24 |
EPD 612 |
I/09 |
29 |
3 hrs. lecture |
4.46 |
4.63 |
CEE 498 |
I/10 |
53 |
.83 hr. lecture |
n/a |
n/a |
EPD 690 |
I/10 |
11 |
1 hr. lecture |
n/a |
n/a |
EPD 690 |
I/10 |
7 |
1 hr. lecture |
n/a |
n/a |
CEE 578 |
II/10 |
61 |
3 hrs. lecture |
||
EPD 612 |
II/10 |
30 |
3 hrs. lecture |
||
INTEREGR 400 |
II/10 |
33 |
1.5 hrs. lecture |
Research Students
Students Graduated
Student |
Degree |
Year |
Topic |
Meyer, G. [Design Supervisor for District 1, Wis. DOT, Madison, WI] |
PhD |
Spr 91 |
Conceptual Model for Integrating business Activity and Data Systems in the AEC Industry |
Jeljeli, M. [Project Manager, National Petroleum Construction Col., United Arab Emirates] |
MS |
Fall 91 |
Potential Applications of Geographic Information Systems to Construction Industry |
Kunigahalli, R. (50% Russell, 50% Veeramani) [System Analyst, Bank One, New York, NY] |
MS (Thesis) |
Fall 91 |
Prototype Construction Robotic Equipment Management System |
Radtke, M. [Project Engineer, Oscar J. Boldt, Milwaukee, WI] |
MS (Thesis) |
Spr 92 |
Guidelines for a Project-Level Constructability Program |
Gugel, J. [Design Engineer, UOP, Chicago, IL] |
MS (Thesis) |
Fall 92 |
Models for Constructability Approach Selection and Input-Source Evaluation |
Severson, G. [Project Manager, Turner, Construction Co., Chicago, IL] |
MS (Thesis) |
Fall 92 |
Predicting Construction Contract Surety Bond Claims Using Constructor Financial Data |
Astour, R. [Construction Engineer, Arabian Construction Co., United Arab Emirates] |
MS (Thesis) |
Fall 92 |
Pilot Investigation of Schedules Supporting a Contractors Financial Statement |
Nebel, R. [Vice President, Nebel Construction Co., Sturgeon Bay, WI] |
MS (Thesis) |
Spr 93 |
Construction Methods for Piling Installation |
Abou-Zeid, A. [Asst. Professor, Structural Engineering Dept., Cairo University, Egypt] |
PhD |
Fall 93 |
Data Flow Identification to Support Project Automation/Integration and Productivity |
O’Brien, T. [Project Manager, William Ryan Homes, Milwaukee, WI] |
MS (Thesis) |
Sum 94 |
Total Quality Management in Construction: A Study of the State of Wisconsin Facility Delivery Process |
Jeljeli, M. [Project Manager, National Petroleum Construction Col., United Arab Emirates] |
PhD |
Sum 94 |
A Risk-Based Methodology for Estimating Contractors–Liability in Superfund Cleanup Construction |
Kunigahalli, R. (50% Russell, 50% Veeramani) [System Analyst, Bank One, New York, NY] |
PhD |
Spr 94 |
Computer Integrated Concrete Placement Planning and Control System |
Taha, M. (50% Russell, 50% Park) [Assist. Prof., Structural Engineering Dept., Cairo University, Egypt] |
PhD |
Spr 94 |
Application of Distributed Artificial Intelligence to Prequalification of Construction Contractors |
Vadakpat, G. [Unknown] |
MS (Thesis) |
Spr 94 |
Analytical Study to Predict Friction on Highway Pavements |
Lin, C. |
MS |
Spr 94 |
Software to Implement Constructability Analysis |
[Construction Engineer, Bechtel, Taipei, Taiwan] |
(Non-Thesis) |
Selection Tool |
|
Swiggum, K. [System Engineer, EPIC, Madison, WI] |
MS (Thesis) |
Spr 94 |
Work Process and Tools to Implement Constructability on Highway Projects |
Sadek, A. [Architect, Wisconsin Dept. of Corrections, Madison, WI] |
MS (Thesis) |
Spr 94 |
Maintainability and Operability of Industrial Construction Projects |
Zhai, H. (50% Russell ,50% Sanders) [Analyst, Dunn & Bradstreet, New York, NY] |
PhD |
Spr 94 |
Stochastic Modeling, Prediction, and Pricing of Contractor Default Risk |
Arneson, J. [Vice President, Building Systems General Corporation, Madison, WI] |
MS (Thesis) |
Fall 94 |
Predictive Tools for Project Managers |
Beyer, D. [Project Engineer, Wisconsin Dept. of Transportation, Madison, WI] |
MS (Non-Thesis) |
Fall 94 |
Characteristics of Effective Safety Programs |
Tserng, H. [Assoc. Prof., National Taiwan University, Taipei, Taiwan] |
MS (Thesis) |
Fall 94 |
Construction Automation of Landfill Construction Sites |
Unger, B. [Project Engineer, C.G. Schmit, Inc., Milwaukee, WI] |
MS (Thesis) |
Spr 95 |
Attributes of an Effective Cost Control Program |
Lawrence S. [Project Manager, J.H. Findorff Construction Co., Madison, WI] |
MS (Thesis) |
Spr 95 |
Development of a Predictive Tool for Continuous Assessment of Project Performance |
Kulprett [Project Engineer, Oscar J. Boldt Group, Appleton, WI] |
MS (Thesis) |
Spr 95 |
Quantitative Documentation of Construction Industry Best Practices |
Ostrand, A. [Project Engineer, Kennedy & Rossi, Inc., Arlington, MA] |
MS (Non-Thesis) |
Spr 96 |
A Compilation of Legal Decisions on Construction Contract Termination |
Morris, M. [Field Engineer, Oscar J. Boldt Construction Co., Appleton, WI] |
MS (Non-Thesis) |
Spr 96 |
Construction of the Whistling Straits Golf Course |
Creamer, P. [Project Engineer, RMT, Inc., Madison, WI] |
MS (Thesis) |
Sum 96 |
Application of TQM to Design and Construction of Hazardous Waste Liners |
Prestine, M. [Project Engineer, R.C. Johnson Construction, Inc., Loretto, MN] |
MS (Thesis) |
Sum 96 |
Developing a Constructability Lessons Learned Database for the State of Wisconsin Department of Transportation Highway Construction |
Krishnamurthy, B. [Sunnyvale, CA] |
MS (Thesis) |
Fall 96 |
Toward an Automated Path-Planning and Real-Time Guidance System for Asphalt Pavement Compaction Operation |
Nelson, G. [Project Engineer, Ryan Companies US, Inc., Scottsdale, AZ] |
MS (Non-Thesis) |
Fall 96 |
Development of an Interactive Relational Database for Bridge |
Park, Junkwon [Unknown] |
MS (Non-Thesis) |
Sum 97 |
Neural Network Approach to Predicting Contractor Failure |
Tserng, Hui-Ping [Assoc. Prof., National Taiwan University, Taipei, Taiwan] |
PhD |
Spr 97 |
Toward a Framework for an Automated Landfill System (ALS) |
Koo, K. [Assist. Prof., University of Seoul, Korea] |
MS (Non-Thesis) |
Spr 97 |
Foreign Exchange Management in International Build-Operate-Transfer Project |
Koch, J. [Project Engineer, Gallegos, Vail, CO] |
MS (Non-Thesis) |
Fall 97 |
Construction Issues with Structural Steel |
Noble, D. [Project Engineer, Boldt Development Services, Milwaukee, WI] |
MS (Thesis) |
Fall 97 |
Guidelines for the Development of Innovative Contracting Practices in the Highway Construction Industry |
Sasongko, Sentot [Unknown] |
MS (Non-Thesis) |
Fall 97 |
Improving Payment Process: A Case Study of Use of Continuous Improvement Analysis for Residential Development Company |
Shr, Jin-Fang [Assist. Prof., University of Taiwan, Taiwan] |
MS (Non-Thesis) |
Fall 97 |
A Framework for Electronic Bidding in the Construction Industry |
Schmitt, R. (50% Russell , 50% Hanna) [Assist. Prof., University of Wisconsin-Platteville, Platteville, WI] |
PhD |
Sum 98 |
Development of Statistically-Based Methods to Determine QC/QA Testing Levels for Hot-Mix Asphalt Construction |
Jung, G. [Project Engineer, Westra Construction, Waupun, WI] |
MS (Thesis) |
Sum 98 |
Rational Method for Determining Minimum Inspection-Levels for Hot-Mix Asphalt Overlay Construction |
Deccio, S. [WisDOT] |
MS (Non-Thesis) |
Sum 98 |
Development of a Standard Specifications Reference File for Inclusion With Lesson Learned Database for the WisDOT Constructability Program |
Dupuis, J. [Project Engineer, Structural Research, Inc., Madison, WI] |
MS (Non-Thesis) |
Fall 98 |
An Investigation into Market Trends of Commercial Roofing Membrane Systems |
Lee, H. [Project Engineer, Daewoo Corp., Seoul, South Korea] |
PhD |
Fall 98 |
Framework for Real-Time Management of Hot-Mix Asphalt Construction Operations |
Meier, J. [Exxon, Floren Park, NJ] |
MS (Thesis) |
Spr 99 |
Design and Construct for Maintainability |
Gerdman, D. [Department of Natural Resources, MSA Professional Services, Inc. Baraboo, WI] |
MS (Non-Thesis) |
Sum 99 |
Design and Construction of Wastewater Treatment Plants |
Thompson, B. [Project Engineer, MSA Professional Services, Baraboo, WI] |
MS (Thesis) |
Fall 99 |
Guidelines for the Implementation of Warranty and Best Value Contracting in the Highway Construction Industry |
Moua, B. [Pritchard Inc., Kansas City, MO] |
MS (Thesis) |
Fall 99 |
State of Practice in Maintainability: Seven Case Studies |
Park, Hyung-Keun [General Manager, Daewoo Corp., Seoul, South Korea] |
MS (Thesis) |
Spr 99 |
Framework for a Methodology to Forecast Construction Cost at Completion for General Contractor in Jobsite |
Lee, Duk Gyoo |
MS |
Fall 99 |
A Framework for Performance-Based Pay |
[Project Manager, URS Corp., O’Brien Kreitzberg] |
(Non-Thesis) |
Adjustment Plan for Hot-Mix Asphaltic Concrete (HMAC) Pavement |
|
Shr, Jin-Fang [Assist. Prof., University of Taiwan, Taiwan] |
PhD |
Fall 99 |
Model Development for Cost-Plus-Time Bidding Applied to Florida DOT Highway Construction |
Kim, Eugene [d’Escoto, Inc, Chicago, IL] |
MS (Non-Thesis) |
Sum 00 |
Sustainable Design |
Kim, Sung-Keun [Korea Institute of Construction Technology, South Korea] |
PhD |
Spr 01 |
Automated Construction Systems |
Mariner, Maria [Unknown] |
MS (Non-Thesis) |
Fall 01 |
Productivity Analysis |
Park, Hyung-Keun [General Manager, Daewoo Corp., Seoul, South Korea] |
PhD |
Fall 01 |
Prototype System for Cost Control |
Koo, Kyo-Jin [Assist. Prof., University of Seoul, South Korea] |
PhD |
Fall 01 |
Foreign Exchange Risk Management in International BOT Project |
Brandt, Carolyn [EarthTech, Inc., Madison, WI] |
MS (Thesis) |
Spr 01 |
Construction Engineering and Management Research |
Blenker, Justin [Unknown] |
MS (Non-Thesis) |
Spr 02 |
Productivity of Masonry Construction |
Jang, HyounSeung [CERIK, Korea] |
PhD |
Fall 02 |
Construction Material Logistics Tasks: Current Level of Satisfaction and Multiple Floor Layout Problems |
Schumacher, Kristopher [J.P. Cullen Construction Co., Milwaukee, WI] |
MS |
Fall 02 |
Integrated Project Development Process |
Mahle, Maureen [unknown] |
MS |
Fall 02 |
E-Commerce Applied to Construction |
DeCicco, S. [WisDOT, Madison, WI] |
PhD |
Fall 03 |
Development of a Standard Specifications Reference File for Inclusion with Lesson Learned Database for the WisDOT Constructability Program |
Choi, Jongsoo [Asst. Prof. Donguk University, Seoul, South Korea] |
PhD |
Spr 03 |
Strategic Motives Underlying M&A Activities in Construction Industry |
Huang, Chun-Nen [unknown] |
PhD |
Spr 03 |
Productivity Chain Management |
Yi, June Seong [Asst. Prof. Ewha University, Seoul, South Korea] |
PhD |
Spr 03 |
Development of Methodology for Applying Activity Based Costing System to Construction Project |
Chin, Chang-Sun [unknown] |
PhD |
Fall 08 |
An Investigation to Improve Construction Information Flows |
Cho, Daegu [unknown] |
PhD |
Fall 09 |
Construction Information Database Framework (CIF) for Cost, Schedule, and Performance Integration |
Lee, Sang Hwan [unknown] |
MS (Non- Thesis) |
Fall 09 |
Analysis of the Critical Factors for Improving RFID Adoption in Construction |
Lee, Jin Cheol [Unknow, South Korea] |
PhD |
Fall 10 |
Evaluating the sustainability of construction with recycled materials |
Rogers, Joshua [CTLThompson, Ft. Collins, Co] |
MS |
Sum 11 |
Unavailable |
Cullen, George [JP Cullen, Janesville, WI] |
MS |
Sum 12 |
Unavailable |
Yeutter, Michael [The Boldt Company, Milwaukee, WI] |
MS |
Sum 12 |
The Use of Building Information Modeling in the Electrical Contracting Industry |
Beyer, Adam [TRC Companies, Inc., Madison, WI] |
MS |
Spr 13 |
Unavailable |
Dupuis, Mathew [Structural Research Inc., Middleton, WI] |
PhD |
Spr 14 |
Sensitivity Analysis of Error in a Roof Membrane Temperature Model Versus Input Data |